AMPERA nuclear power system: reactor, heat exchanger and power conversion modules in a studio

PowerNOW · commercially available Q1 2028

Factory-built sCO2 power on gas today. A sealed thorium core on the same platform tomorrow. No stranded asset.

The constraint

Compute is scaling faster than the grid can connect it. So the power has to come to the load.

U.S. electricity usage and generation, TWh per year. Curve shape simplified; 2035 values as published in AMPERA Master Financial Projections.

2035 projected shortfall

1,574

TWh, about 180 GW continuous

Usage grows 64%, generation 26%. AI load alone adds 1,100 TWh, slightly more than all projected U.S. generation growth.

The nuclear module. In the round.

0°Rotation

01 / Nuclear reactor module

Thorium core

A 3D-printed, solid-state thorium core inside a shielded sphere. No refueling for a target of up to 30 years.

One platform

Same power block. Swap the heat source.

Deploy PowerNOW on gas today. When the nuclear module is licensed, it replaces the thermal module. Same power block, same site, same interconnect.

AMP-G7.5 PowerNOW system: burner thermal module, power module and heat rejection module
Power nowFlex fuel: gas, LNG, CNG, diesel, hydrogen
AMPERA nuclear system: reactor module, heat exchanger module and power conversion module
Nuclear nextSealed thorium core
Where it deploys

Firm power where the grid can't reach.

Containerized, factory-built, rapidly deployable. One product line for four markets.

Nuclear next

A reactor you
never refuel.

The first full-scale 3D-printed nuclear reactor module: solid state, built around a proprietary gyroid structure with microchannels. It runs subcritical, driven by an external neutron source, so it switches on and off instantly and is passively safe.

Output
7.5 / 15 MWe
Efficiency target
>50%
Life, no refueling
Target up to 30 years
Architecture
Subcritical, accelerator driven
Fuel
Thorium TRISO, liquid-metal jet printed
4×more abundant than uranium
1000×smaller waste footprint
100×lower cost than HALEU

The power block · sPower

Reinventing power conversion.

Closed-loop supercritical CO2 replaces the steam Rankine cycle with a high-temperature Brayton cycle. Compact, water-free, quieter, and agnostic to its heat source. Future-proofed for fission and fusion.

System efficiency
50–60%
Size reduction
50%, via additive manufacturing and nickel superalloys
Heritage
20 years of R&D, thousands of operating hours
sPower: supercritical CO2 power blockAMPERA power conversion module: sCO2 turbomachinery and generator behind a glass panel
sPower conversion module
Factory production

Built on a line. Shipped on a truck.

Rapid scaling comes from the factory, not the job site. Modules are fabricated, integrated and tested under one roof, then lifted onto a trailer.

01/ 11

Receiving dock with forklifts unloading pallets of material
01Freight in
CNC machining cells and fabrication stations along a factory aisle
02Fabrication and machining
Additive manufacturing cells with metal printers and inspection benches
03Additive manufacturing
Overhead view of four parallel PowerNOW assembly lines
04Four PowerNOW lines
Finished module carried down the line transport aisle on an autonomous transporter
05Line transport aisle
Heat rejection modules being integrated at assembly stations
06Heat rejection integration
Technicians wiring electrical and instrumentation and control cabinets
07Electrical and I&C integration
Quality inspectors performing non-destructive examination on a module
08Quality and NDE hold
Control room operators monitoring three modules under test
09Connected system test
Finished systems staged in rows awaiting shipment
10Finished system staging
Overhead crane lifting a finished module onto a flatbed trailer
11Crane lift to trailer
Concept renderings
Economics, target

Redefining nuclear economics.

A target long-term LCOE of about $20/MWh, from factory-built reactors and a sovereign thorium fuel strategy.

Capital cost$M / MWe

AMPERA$1.7
Solar PV + storage$1.4
Gas combined cycle$1.5
Wind + storage$2.1
Nuclear, U.S.$6.0
Fusion$15.0

Levelized cost$ / MWh

AMPERA$20
Wind + storage$44
Gas combined cycle$48
Solar PV + storage$50
Nuclear, U.S.$141
Fusion$200

Sources: non-company benchmarks from publicly available third-party data (Lazard LCOE+ 2025 low-end estimates, U.S. EIA AEO2025, DOE and OECD/NEA advanced nuclear and SMR studies, peer-reviewed fusion economics). AMPERA values are internal target economics assuming scaled factory-built deployment and are not demonstrated commercial operating data. LCOE is the average cost to generate 1 MWh over a project's life, including capital, operations, maintenance and fuel. Capital cost is the estimated $M invested per MW of electricity.

Affiliations

  • American Nuclear Society
  • World Nuclear Association
  • Nuclear Energy Maritime Organization
  • Consumer Energy Alliance
  • Business Development Board of Palm Beach County
  • Palm Beach North Chamber of Commerce
  • PGA Corridor Association